BANGALORE:The Failure Analysis Committee (FAC), constituted for investigating the failure of ISRO‘s Geosynchronous Satellite Launch Vehicle, GSLV-F02 mission from Satish Dhawan Space Centre (SDSC SHAR) Sriharikota, on 10 July, 2006 has submitted its report.


The 49 metre tall and 414 tonne GSLV comprises three stages. The first stage consists of a solid propellant motor and four liquid propellant strap-ons. The second stage is also a liquid propellant stage and the third is a cryogenic stage.



GSLV-F02 launch was the fourth in the series. All the three earlier missions (GSLV-D1, D2 and F01) were completely successful. The mission objective of GSLV-F02 was to place Insat-4C, an operational satellite into Geo-synchronous Transfer Orbit (GTO). About 55 sec into the flight, GSLV-F02 started deviating significantly from its nominal flight path resulting in the vehicle breaking up at 62 sec after lift-off. The debris fell into Bay of Bengal.


The 15 member FAC chaired by K Narayana, former Director of SDSC SHAR, with the participation of experts from academic and research institutions besides ISRO, has reviewed the performance of GSLV-F02 from lift-off to the end of flight. FAC had detailed deliberations for over 100 hours in several sittings and was assisted by eight specialist sub-committees examining the flight data of vehicle subsystems, manufacturing documents, inspection, calibration and test results, etc. Especially, the details related to the realisation of liquid propulsion stage of GSLV were closely scrutinized. Several tests simulating possible failure modes were also conducted to identify the exact cause.


FAC has concluded that the performance of all vehicle subsystems, except one strap-on stage was normal until 56.4 sec. The primary cause for the failure was the sudden loss of thrust in one out of the four liquid propellant strap-on stages (S4) immediately after lift-off at 0.2 sec. With only three strap-on stages working, there was significant reduction in the control capability. However the vehicle attitude could be controlled till about 50 sec. At the same time the vehicle reached the transonic regime of flight and the vehicle attitude errors built up to large values, resulting in aerodynamic loads exceeding the design limits thus leading to break up of the vehicle.


The thrust of the liquid engines used in the strap-on stages is precisely controlled by a set of regulators. Detailed analyses have indicated that in S4 engine the thrust control was not effective. Instead of stabilizing at 5.85 MPa (Mega Pascal) chamber pressure, it reached 7.11 MPa at 2.8 sec. This was much beyond the design limits and the engine failed at 0.2 sec after lift-off, that is 5 sec after its ignition.


Simulations and analyses of flight data and verification through calibration tests have led to the conclusion that the propellant regulator in the failed engine had much higher discharge coefficient in its closed condition. The reason for this could be an inadvertent error in manufacturing, which escaped the subsequent inspection, and acceptance test procedures. This regulator has functioned satisfactorily in all the previous 50 engines manufactured and tested so far, states an official release.


The larger flow of propellant led to higher operating pressure in the gas generator (4.7 MPa against design specification of 3.6 MPa). Due to this higher operating pressure of the gas generator, the water flow rate into it got reduced. The combined effect of larger flow of propellants and reduced flow of water led to a very high gas temperature of 1823 K against design specification of 900 K and pressure of 4.7 MPa against the design specification of 3.6 MPa. The very high operating pressure and temperature resulted in the structural failure of the gas generator. The consequent abrupt stopping of the turbo pumps that feed propellants at very high pressures to the engines led to loss of thrust of S4 engine. The water calibration tests conducted simulating the malfunction of the propellant regulator hardware could closely reproduce the flight phenomenon thereby confirming the larger flow area.


FAC has concluded that the design of GSLV is robust and recommended implementation of strict control on fabrication, inspection and acceptance procedures. Among others, FAC has recommended fabrication processes to be critically reviewed and updated. It has recommended for independent inspection of all critical dimensions of components and subassemblies by in-house agencies. Further, long duration hot test on one out of every 20 engines fabricated has been recommended to ensure that production process is under control. In addition, FAC has recommended strengthening the process of clearance of launch during Automatic Launch Sequence (ALS) phase.


FAC conclusions and recommendations have been accepted and necessary action has been initiated to implement all of them, the release adds.

Latest Reads

http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2017/02/27/Ajit%20Pai-800x800.jpg?itok=eQaNXAO8
Next-gen TV transmission standard proposed by US panel, to foster innovation

MUMBAI: The Federal Communications Commission (U.S.) has sought comment on a proposal that would allow television broadcasters to use the “Next Generation” broadcast television transmission standard, called “ATSC 3.0,” on a voluntary, market-driven basis.

Technology Software Applications
http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2017/02/25/Verizon-Operator_0.jpg?itok=_r9RjMEN
Processing video from linear to live, OTT & VR: Verizon launches Exponent for global carriers

MUMBAI: Verizon has globally launched Exponent, a new business and technology venture offering a portfolio of software and internet platforms designed to enable carriers around the world to quickly deploy and launch next-generation solutions. Exponent offers a foundation for carriers to fuel their...

Technology Software Applications
http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2017/02/25/Joe-French%20%281%29.jpg?itok=z26sS4io
Masstech announces key management promotions

Masstech – the trusted provider of innovative workflow and media asset management solutions – has announced two key management promotions. Savva Mueller has been named the company’s Vice President of Product Management and Marketing, while Joseph French has been promoted to Director of North...

Technology Software Applications
http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2017/02/24/Wire-and-cable-market%20%281%29.jpg?itok=_IlHm39q
Wire and cable market in India to expand at 15.61 pc CAGR by '20

Industry experts forecast the global electric wire and cable in India market to expand at a CAGR of 15.61 per cent during 2016-2020.

Technology Hardware Components
http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2017/02/21/optical%20fiber-800x800.jpg?itok=D69vNMjs
Power transmission towers & cables market forecast to expand at 7 pc CAGR by '23

MUMBAI: The power transmission towers and cables market is expected to exceed more than US$ 14 billion by 2023 expanding at a CAGR of more than 7.0 per cent in the given forecast period 2015 and 2023, according to Market Research Engine's new report which also covered Indian companies such as...

Technology Hardware Components
http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2017/02/13/naveen%20%281%29.jpg?itok=-P6RmzSx
Triple Play targets cable & net subs, deploying Conax-secured, multi-DRM

Conax, part of the Kudelski Group, and a leader in total service protection for pay-TV and digital entertainment services worldwide via broadcast, broadband and connected devices, has announced that Indian pay-TV operator Triple Play has selected technology from Conax and Corpus to help drive...

Technology Software Middleware
http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2017/02/07/Sue%20Rudd-800x800.jpg?itok=0lmTkd23
5G TV may rival cable, satellite & IPTV: Report

MUMBAI: TV and video delivery is likely to become a core capability of next generation 5G wireless services, concludes a new report from Strategy Analytics. Recent demonstrations have suggested that 5G will support 1Gbps data throughput rates. Combining 5G with other networking enhancements and...

Technology Hardware Uplinking & Downlinking
http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2017/01/24/SONY-LG-800x800.jpg?itok=SQnBzrjz
LG, Sony to stop making 3D TV sets

MUMBAI: At one stage it was touted as the future of television. Thanks to the stupendous success that James Cameron’s 3D version of Avatar achieved at the box office with its spectacular 3D graphics and colors. A rash of manufacturers rushed in rolling out 3D TV sets which could be watched with...

Technology Hardware Distribution
http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2017/01/21/CESAUTOMOTIVE800X800.jpg?itok=j1qYdiEF
CES 2017 catapults a connected world

LAS VEGA: CES 2017, the 50th anniversary of the largest global gathering of innovation and connectivity, concluded today, introducing ground-breaking products, providing opportunities for companies in every major global industry to conduct business, and shattering records.

Technology ces

Latest News

Load More

Sign up for our Newsletter

subscribe for latest stories