Technology

Liquid propellant strap-on failure primary cause for Insat 4C crash













BANGALORE:The Failure Analysis Committee (FAC), constituted for investigating the failure of ISRO‘s Geosynchronous Satellite Launch Vehicle, GSLV-F02 mission from Satish Dhawan Space Centre (SDSC SHAR) Sriharikota, on 10 July, 2006 has submitted its report.


The 49 metre tall and 414 tonne GSLV comprises three stages. The first stage consists of a solid propellant motor and four liquid propellant strap-ons. The second stage is also a liquid propellant stage and the third is a cryogenic stage.



GSLV-F02 launch was the fourth in the series. All the three earlier missions (GSLV-D1, D2 and F01) were completely successful. The mission objective of GSLV-F02 was to place Insat-4C, an operational satellite into Geo-synchronous Transfer Orbit (GTO). About 55 sec into the flight, GSLV-F02 started deviating significantly from its nominal flight path resulting in the vehicle breaking up at 62 sec after lift-off. The debris fell into Bay of Bengal.


The 15 member FAC chaired by K Narayana, former Director of SDSC SHAR, with the participation of experts from academic and research institutions besides ISRO, has reviewed the performance of GSLV-F02 from lift-off to the end of flight. FAC had detailed deliberations for over 100 hours in several sittings and was assisted by eight specialist sub-committees examining the flight data of vehicle subsystems, manufacturing documents, inspection, calibration and test results, etc. Especially, the details related to the realisation of liquid propulsion stage of GSLV were closely scrutinized. Several tests simulating possible failure modes were also conducted to identify the exact cause.


FAC has concluded that the performance of all vehicle subsystems, except one strap-on stage was normal until 56.4 sec. The primary cause for the failure was the sudden loss of thrust in one out of the four liquid propellant strap-on stages (S4) immediately after lift-off at 0.2 sec. With only three strap-on stages working, there was significant reduction in the control capability. However the vehicle attitude could be controlled till about 50 sec. At the same time the vehicle reached the transonic regime of flight and the vehicle attitude errors built up to large values, resulting in aerodynamic loads exceeding the design limits thus leading to break up of the vehicle.


The thrust of the liquid engines used in the strap-on stages is precisely controlled by a set of regulators. Detailed analyses have indicated that in S4 engine the thrust control was not effective. Instead of stabilizing at 5.85 MPa (Mega Pascal) chamber pressure, it reached 7.11 MPa at 2.8 sec. This was much beyond the design limits and the engine failed at 0.2 sec after lift-off, that is 5 sec after its ignition.


Simulations and analyses of flight data and verification through calibration tests have led to the conclusion that the propellant regulator in the failed engine had much higher discharge coefficient in its closed condition. The reason for this could be an inadvertent error in manufacturing, which escaped the subsequent inspection, and acceptance test procedures. This regulator has functioned satisfactorily in all the previous 50 engines manufactured and tested so far, states an official release.


The larger flow of propellant led to higher operating pressure in the gas generator (4.7 MPa against design specification of 3.6 MPa). Due to this higher operating pressure of the gas generator, the water flow rate into it got reduced. The combined effect of larger flow of propellants and reduced flow of water led to a very high gas temperature of 1823 K against design specification of 900 K and pressure of 4.7 MPa against the design specification of 3.6 MPa. The very high operating pressure and temperature resulted in the structural failure of the gas generator. The consequent abrupt stopping of the turbo pumps that feed propellants at very high pressures to the engines led to loss of thrust of S4 engine. The water calibration tests conducted simulating the malfunction of the propellant regulator hardware could closely reproduce the flight phenomenon thereby confirming the larger flow area.


FAC has concluded that the design of GSLV is robust and recommended implementation of strict control on fabrication, inspection and acceptance procedures. Among others, FAC has recommended fabrication processes to be critically reviewed and updated. It has recommended for independent inspection of all critical dimensions of components and subassemblies by in-house agencies. Further, long duration hot test on one out of every 20 engines fabricated has been recommended to ensure that production process is under control. In addition, FAC has recommended strengthening the process of clearance of launch during Automatic Launch Sequence (ALS) phase.


FAC conclusions and recommendations have been accepted and necessary action has been initiated to implement all of them, the release adds.

Latest Reads

http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2016/11/17/Rahul%20Nehra.jpg?itok=mP6RbVf2
Friend MTS-Castle Media to tackle Bollywood's digital piracy using unique watermark tech

MUMBAI: Piracy is a serious challenge to the entertainment industry in India. In fact, according to the Motion Pictures Distributors Association of India (MPDA), India country is infamous for having one of the highest rate of video piracy in the world. Lack of stringent IP protection laws to...

Technology Software Applications
http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2016/11/11/set-top-box-800x800.jpg?itok=pz9wqMdr
India poised to emerge as lucrative market for UHD STBs

The growing inclination of people towards ultra-high definition video viewing can be attributed as a major reason for the 4K Set-Top Box’s (STB) market growth. According to a report by Grand View research, the global 4K STB market size is projected to reach US$7.18 billion by 2024.

Technology Hardware Set-top Boxes
http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2016/11/01/Reliance-Jio-800x800_1.jpg?itok=Z9RZ3iGr
Reliance Jio to launch Android powered 4K STBs

Enjoying huge waves of success, Reliance Jio, within few months of its launch, plans to launch Android powered set-top boxes (STBs) in India. Following its idea of providing free 4G internet, this is believed to be Jio's second step in building their envisioned Digital Ecosystem in India.

Technology Hardware Set-top Boxes
http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2016/10/25/bi-800x800_0.jpg?itok=tfaGWUVv
Highly-beneficial interactions take place at Broadcast India '16

The 26th Broadcast India Show concluded over the weekend in Mumbai, and was easily the most exciting Broadcast India Show yet. With thousands of eager, high-quality trade visitors swarming the show floor, a sentiment signalling highly-beneficial exchanges and interactions echoed through the halls...

Technology Software Applications
http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2016/09/23/Untitled-1_28.jpg?itok=sUqa1jZF
India, China to propel APAC, beat CAS Europe market share

APAC is expected to overtake the market share of Europe in future due to an increasing demand for digital TV set-up boxes in countries such as China and India. North America and Europe dominated the global CAS market in 2015. APAC region is estimated to mark a growth rate of 12.0 per cent CAGR...

Technology Hardware Set-top Boxes
http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2016/09/23/Untitled-1.jpg?itok=I_5UAd8p
India lucrative market for 4K UHD STBs: Grand View Research

Here’s a view on the demand for 4K or ultra high definition (UHD) set-top boxes (STBs) in India.

Technology Hardware Set-top Boxes
http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2016/09/19/Untitled-1_0.jpg?itok=Op9PJAk4
Infor appoints Dass as south Asian subcontinent V-P

Infor, a leading provider of business applications specialized by industry and built for the cloud, has appointed Ashish Dass as the vice president and managing director for the south Asian subcontinent. Infor software helps eliminate the need for costly customization through embedded deep...

Technology Software Applications
http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2016/09/06/Untitled-1_12.jpg?itok=gePFFzBo
Siti & DishTV opt for Conax conditional access

The Essel group has been using Conax’s tech for sometime now for its Siti Network (earlier known as Siti Cable). Now the group has extended that partnership for another product for both Siti Network and DTH operator Dish TV India. This time it is for the cardless set top boxes that the two are...

Technology Hardware Set-top Boxes
http://www.indiantelevision.com/sites/drupal7.indiantelevision.co.in/files/styles/340x340/public/images/tv-images/2016/09/06/Imagine%20Communications.jpg?itok=hHV0BPjB
Imagine Communications extends functionality of Selenio One unified transcoding platform to OTT

MUMBAI: Imagine Communications, empowering the media and entertainment industry through transformative innovation, today introduced a high-density adaptive bitrate (ABR) transcoding product built on Selenio One™, the company’s software-defined linear transcoding platform. Selenio One is designed...

Technology Hardware Components

Latest News

Load More

Sign up for our Newsletter

subscribe for latest stories